Controls how the panels are shown. View > Assembly orders the panels by their planned start date in ascending order. This is the default setting. Click View > Workplace to group panels by work place.
Panel scheduling is not possible when panels are grouped by work place.
Optimization
Click Optimize to open the panel optimizer. Click Accept Current Plan to update the current scheduling information (as it is shown in the Gantt-chart) into the database. For more information, see Panel optimization.
Scheduling
Use the Schedule button to reschedule the panel line. The main difference between optimizing and scheduling is that scheduling does not rearrange panels. Instead, the panels remain in the same order.
By default, you can configure the start date for scheduling it is the current date. Also, two scheduling rules can be applied:
Schedule after Assembly Start Date
Prevents panels being scheduled before their desired start date.
Schedule after Part Completion Date
Prevents panels being scheduled before the parts required by the panel are ready. The part completion dates are taken from the nestings that contain the parts.
Window
The Legend button opens a window that shows each work place and the corresponding color.