After a part pick list is created and accepted in the Work Queue, it appears in the Workshop Part Picking. If there are several part picking workplaces and if the parameter NWSPickingWorkplaceRequired is set as True, the pick list is shown in one workplace that was chosen when creating the list.
The part picking workplace page is opened from the main page of the workshop. Part picking workplaces are grouped to lists under the work groups as a default. The configuration of the work groups and places is done in the System Settings application.
Return to main page
You can always return to the main page from the workplace pages. Click the icon in the upper left corner to return to the main page.