Before you build CCCs, set the following project defaults for the proposal project:
Project Default |
Description |
---|---|
ZS_ALL_CGR |
This project default controls building commodity geometric relations whenever a concept commodity code is created. This project default is used in a proposal project only. If ZS_ALL_CGR is set to Y, commodity geometric relations are built whenever a concept commodity code is created. If ZS_ALL_CGR is set to N, commodity geometric relations are not built when a concept commodity code is created. Note that the S.40.22 Commodity Geometric Relations will be opened in read-only mode. |
ZS_TD_VAL |
This project default controls validating the table detail length with the number of digits allocated for the corresponding table in the commodity rule. If ZS_TD_VAL is set to W, a warning message is displayed when the length of table detail entered/selected in the Commodity Code Detail block of S.30.11 does not match with the number of digits allocated in the rule. If ZS_TD_VAL is set to E, an error message is displayed when the length of table detail entered/selected in the Commodity Code Detail block of S.30.11 does not match with the number of digits allocated in the rule, and you cannot proceed without resolving this issue. If ZS_TD_VAL is set to N, no validation is performed regarding the table detail length. |