Release a Spool based on lot status - Intergraph Smart WQMS - 6 - Help - Hexagon PPM

Intergraph Smart Weld Quality Management System Help

Language
English
Product
Intergraph Smart WQMS
Search by Category
Help
Smart WQMS Version
6

You can now release a spool only if all the lots related to the welds in a selected spool have been accepted. Based on certain conditions, you can release the spool to make it inline with Lot Management which helps in measuring the quality of the welds in a project.

You can release a spool and meet the conditions specified below only if Lot Management module is enabled for a project.

The following conditions must be met before releasing a spool:

  1. The spool can be released only if all the lots related to welds in the selected spool have been accepted.

  2. The Lot acceptance status of the lots related to the welds must be Accepted

  3. The production welds related to the spool must be accepted.

  4. The number of welds selected for NDT must match with the number of welds that have completed NDT.

To release a spool, follow these steps:

  1. Navigate to Piping > Spool Status

  2. Select the drawing from ISO/Drawing No: list and click Refresh

  3. The spools related to the lot are displayed

  4. Select the spool and click Release Spool to release the spool.

    The IsReleased, ReleaseBy, ReleaseDate fields are stamped indicating that the spool is released.