Building the Vessel from the Bottom Up - PV Elite - Installation & Upgrade - Hexagon

PV Elite Quick Start

Language
English
Product
PV Elite
Subproduct
PV Elite
Search by Category
Installation & Upgrade
  1. Click Ellipse to place the bottom head.

  2. Click Cylinder to place the main shell.

  3. Click Ellipse again to place the top head.

    If you look at the window to the right, the software displays a 3D view of the model.

  4. You can switch to the 2D view by selecting the 2D View tab under the model representation.

  5. If you want to go back to the 3D view, click the 3D View tab.