Assign a receiving status to project default ZC_STATUS. This status is set when you create a new material receiving report (MRR). The MRR number is generated automatically based on the pre-defined MRR rule assigned to the user. If no MRR rule was assigned, the MRR rule marked as the default is used. The revision of a new MRR number is always 0 (zero) and is increased by 1 automatically when an MRR revision is made.

Material can only be received in a corporate warehouse in the project owning the warehouse.

This training describes material receiving by PO. For more information about the other receiving methods, see How do I receive materials?.