Progress allows lead engineers, planners, project managers, and document controllers to plan and report on the development of time-critical activities related to a project. It provides the functionality to track the development of deliverables, such as documents or drawings, against a project plan, indicating any deviations from the original plan.

Reporting functionality built into Progress allows you to report on man-hour budgets and the man hours necessary to complete the deliverable, and to view progress at varying levels within the project hierarchy.

When deliverables are registered with the progress functionality, they are assigned to a workpack, which is a group of deliverables that share project information and steps within their lifecycle. Workpacks are based on a hierarchy defined for the progress project, and deliverables are matched with a workpack based on that hierarchy.

View Progress dialog box

Displays detailed progress calculations for historical rollups initiated manually and project cut-off dates. Dates are organized by the last date when a rollup was run (Most Recent), defined cut-off dates for the project, and other dates when a rollup was run manually. Expand a category in the tree to view the dates for which progress details were calculated. Expand a date to see detailed information calculated at that time. The details can be viewed at the project level, or you can view details at each level of hierarchy by specifying design or activity progress. Select the node that represents the level at which you want to view the data, and then use the View Progress command on the shortcut menu to view the details.

Progress Rollup S-Curve dialog box

Shows a graphical representation of the progress information, including the planned, actual, and forecast data, when applicable. Cut-off dates make up the x-axis, and percent complete makes up the vertical axis.