Overview of the tag creation and handover register generation work process - SmartPlant Foundation - IM Update 48 - Help - Hexagon

SmartPlant Foundation Help

Language
English
Product
SmartPlant Foundation
Search by Category
Help
SmartPlant Foundation / SDx Version
10
SmartPlant Markup Plus Version
10.0 (2019)
Smart Review Version
2020 (15.0)

This section provides a simple example workflow to help you become familiar with SmartPlant Master Tag Registry. It outlines how you can allocate tags, get technical details from vendors for those tags, and generate a tag register.

Let's consider that you are a Project Data Coordinator or Project Engineer, and you want to generate a tag register with equipment tags to check the accuracy and consistency of tag numbering. You also want expedite operational readiness and perform asset management. Using SmartPlant Master Tag Registry workflows you can easily create tags and generate tag registers.

To get started with SmartPlant Master Tag Registry, make sure that the pre-requisites are installed on your computer as described in the SmartPlant Master Tag Registry Installation and Setup Guide. Also, make sure a plant breakdown structure has been defined containing a Unit named “10”.

In this scenario, you need to perform the following tasks:

The following diagram shows how the above tasks are related to each other.

Page-1 Generate an equipment tag register Create a register document Publish tags Create a snapshot of the EquipmentAuthDoc authored document Create an authored register document and associate tags Edit tags using List Edit Import tags into SmartPlant Master Tag Registry Define tag data Generate a datasheet with equipment type tags Pre-allocate tags Create a unit