The revision scheme of a document can change from one revision to another, for example, when a document is revised from a plant configuration into a project configuration. When a project revision is merged back up to the plant, the revision either retains the revision details it had in that project, or takes out the next available revision at the plant, as dictated by options on the merge command.
For more information on the revision scheme configuration model, see Revision schemes configuration.