Unlock Plant After Group Rename Command (Tools Menu) - Intergraph Smart P&ID - Help - Intergraph

SmartPlant P&ID Drawing Manager Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
SmartPlant Foundation / SDx Version
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)
Smart P&ID Web API Version
(none)

If a plant group name is used for validation or is part of an item tag name, and that plant group is renamed in Smart Engineering Manager, it will affect the drawing.  This command can be run to unlock the drawings so that the properties containing the new plant group name are updated.

This command operates on a per-user basis, provided that the particular user has Full Control access to Options Manager for the selected plant.