Report Command - Intergraph Smart P&ID - Help - Intergraph

SmartPlant P&ID Drawing Manager Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
SmartPlant Foundation / SDx Version
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)
Smart P&ID Web API Version
(none)

Displays detailed information about out-of-date drawings.  Criteria that can be checked includes select list values, formats, out-of-date symbols, missing symbols, rules, heat tracing, gapping, symbology, OPCs, and so forth.

You must select one or more drawings prior to selecting this command.  The information displays in Microsoft Excel and is based on options selected using the Out-of-Date Drawing Criteria command. If all drawings are up-to-date, a message box displays stating that all selected drawings are up-to-date.

  • When upgrading a plant, drawings may be out of date for any of the out‑of‑date criteria.

  • In order to use this command, you must be assigned the user right Update P&ID on the Role Properties dialog box in SmartPlant Engineering Manager.  Also, you are required to have Full Control assigned on P&ID Objects.