The constant workload times are updated for the named tasks. The workload times in the list are part-specific, quotation item/order item -specific, or quotation/order -specific, and all use the same material.
Time values for one part are:
Part Nesting Time
Cutting Part Marking
Part Packing Time
Part Measuring Time
Shear Cutting Time
Shear Cutting Part Marking
Shear Cutting Part Picking
Bending Measuring Time
Bending Pressing Time
Straightening Time
Subcontracting Time
Charge Number Transfer (Internal)
Charge Number Transfer (External)
Material Certificate
Time values for quotation/order item are:
Part Geometry Drawing
Part Geometry Checking
Cutting Reading Instructions
Shear Cutting Reading Instructions
Shear Cutting Machine Setup Time
Shear Cutting Cleaning Scrap
Bending Reading Instructions
Straightening Setup Time
Beveling Setup Time
Manual Bevel Base Time
Mechanical Bevel Base Time
Blasting Base Time
Time values for quotation/order items using the same material are:
Nozzle Setup Time, Plasma
Nozzle Setup Time, Flame
Nozzle Setup Time, Laser
Nozzle Setup Time, Water
Shear Cutting Plate Lifting
Shear Cutting Cleaning Scrap