Additional Work Times - Intergraph Smart Production - 20 - Help - Hexagon

Intergraph Smart Production System Settings

Language
English
Product
Intergraph Smart Production
Search by Category
Help

Several additional work times related to pipe cutting process can be defined at work place level. The Work Time Calculation tab can be found in NESTIX System Settings by selecting Work Place from the tree branch.

  • Work Instruction (Minutes / Nesting)

  • Nozzle Handling (Minutes / Nesting)

  • Material Handling (Minutes / Stock Material)

  • Scrap Removal (Minutes / Stock Material)

  • Manual Part Marking (Minutes / Part)

  • Part Picking Depending on Part Weight (Minutes / Part)