Follow the procedure below to update the project structure attributes.
-
In the Estimate Structure Details panel, click the General tab.
-
Edit the Object Name, if required.
-
Click the ellipsis and select the required values:
-
Type - Select a project type.
-
(Optional) Responsible Manager - Select a responsible manager.
-
-
(Optional) Type in the required Objective.
-
Click SAVE.