A defined set of time-phase methods can be used to establish the Curve, Start Date, and End Date. Once established, these attributes will be utilized when time-phasing the estimate project. The following time-phasing methods can be assigned:
-
Back Loaded - Line items spread in a back-loaded curve.
-
Front Loaded - Line items spread in a front-loaded curve.
-
Linear - Line items spread linearly.
-
Bell - Line items spread in a bell curve.
Follow the procedure below to update the time-phase estimates settings.
-
Click the Time Phasing tab.
You can customize the Start Date, End Date, and Curve fields in the Estimate Summary panel from the View Settings.
-
Select the Start Date and End Date.
-
Click the Curve ellipsis and select the required curve for time-phasing.
-
Click SAVE.