The Copy and Load command line workflow serve as essential components for managing plant structure data. Creating an XML file that contains database information and then loading the plant with the XML file, enable seamless database platform migration.
Follow the workflow process recommended below:
-
Copy Plant (Save Plant) command.
-
Create an XML file for the Load command.
-
Load Plant with an XML file command.
-
Load plant with command line parameters.
Smart Engineering Manager conducts the following checks when accepting the parameters:
-
Verifies that the necessary parameters exist in the command line.
-
Determines if the site can be opened with the specified site path defined in the command line.
-
Checks if the plant exists in the site (for 'Copy' mode).
-
Ensures that the package file exists in the path defined in the command line.
-
Validates if the parameter in the command line is appropriate for the selected mode, based on the list in the tables below.