This option enables you to select and generate a maintenance report. You can generate the following reports:
-
Scheduled Preventive Maintenance Report
-
Summary of Failure Reason Report
-
Summary of Repair Action Report
-
Summary of Outcome Report
-
Repair Details Report
-
Start the Maintenance module.
-
From the Reports menu, select the report that you want to generate.
-
On the Report Properties dialog, in the Date range group box, do one of the following to set the date range for the report:
-
Select the Specified dates option and set a specific period by typing or selecting the required dates from the From and To lists.
-
Select the Predefined option to generate a report for the last, current or next week, month, or year.
-
-
To filter the data level of the report, select Plant, Area, or Unit.